- 2011-07-08:
Fase 1 of EVE calculater done. Been looking at the final design, should be possible to make generic for multiple user system.
- 2011-06-21:
New monitoring solution online. Firewall monitoring incresed to paranoid level.
- 2011-06-14:
Updated firewall, now it is even more paranoid.
- 2011-06-10:
Setup a SMS gateway service on secondary location.
- 2011-06-01:
New homepage on new hardware and new location with ipv6.
- 2011-05-25:
VPS downed and hosting provider not reacting to e-mails.
- 2011-05-01:
Changed job to TDC Hosting.